I have a large house 650m2 and Andrew at the Green Building Store has recommended 2 x Paul Novus 450 MVHR units or a 350 and a 450.
How would I deal with this in PHPP?
If its the same unit do I need to worry
If I use two units do I model both and take the average?
thanks
Rachel