Publication : Low Energy Case Study – Oxlet

OxletLike many houses which are built by sub-contractors and project-managed by the owners, this one took a number of years.  The project was first conceived in 1997-98. Design was underway in the early 2000s and was completed by mid 2003. Construction began in late 2003 on a largely direct labour basis. The owners moved in in summer 2006. The house received a Completion Certificate from Herefordshire Council Building Control in summer 2008.

  1. Download

    Document : Low Energy Case Study – Oxlet (4 MB)

Categories: | Author: |

See more posts in

Low Energy Case Study – Greenoak | Low Energy Case Study – Ross-on-Wye
Keep up to date with the AECB AECB Forums