Founded by Tim Hulse in 2011, EcoVert Solutions are experts in Passivhaus construction with experience covering more than 50 residential projects including Passivhaus new builds, retrofit and extensions, offering an broad combination of  low-energy design and build knowledge and experience. EcoVert built the first certified Passivhaus new build in North Wales, which was completed in 2015.

Tim completed a Masters Degree in Architecture at CATT in 2011, certified as a Passivhaus Designer in 2013 and subsequently as a Passivhaus Tradesperson together with three other members of his team, has completed the AECB Carbonlite Retrofit Foundation course, and is currently studying for the AECB Retrofit Coordinator course. Tim was invited to participate as an expert on “buildability” at the AECB’s annual conference in Hereford in September 2022.

Orchard House

Completion: 2020

Approved under Paragraph 78 for new build in green belt – outstanding design

ARCHITECTS: Studio Bark

STRUCTURAL ENGINEERS: Structure Workshop

BUILDING MATERIALS

English Larch cladding
English sweet chestnut shutters
Sedum green roof
Solar PV
Air source heat pump
Trombe wall to retain heat
Passive slab raft foundation incorporating UFH
I-Joist walls with Warmcel recycled cellulose & wood fibre insulation
Partel and Proclima air tightness tapes and membranes
Glulam beams and portal frame
Passivhaus windows and door from The Green Building Store
Curtain wall
Ventilation via push pull extract fans with heat recovery


Long Meadow Barn
Completion: 2021
Architects: Shaw and Jagger Architects Ltd
Foundation – Isoquick passive slab with power floated reinforced concrete
Walls – Timber frame construction with 300mm I-Joists and glulam sole plate and wall beam, with locally sourced Stone and British Western Red Cedar cladding
Roof – 400mm I-joists with exposed glulam ridge beams with Natural slate finish and Lindab gutters and downspouts
Insulation – Warmcel recycled cellulose & wood fibre insulation to walls and roof with Peninsula frames glass blocks and Compacfoam for thermal breaks
Air tightness: Partel and Proclima air tightness tapes and membranes
Intermediate floor – 300mm I-joists
Windows & doors – Triple Glazed Passivhaus from Green Building Store
Rooflights  – Fakro
M&E:
MVHR – Paul Novus from Green Building Store
Solar PV – 4.48kW in-roof Solar PV array with immersion switch and 7.0kW battery
Charging station for electric vehicle
Heating source – Air Source Heat Pump
Packaged Sewage Treatment Plant

Swn y Nant
Architects: Simmonds Mills
Foundation – custom  passive slab with power floated reinforced concrete
Walls – Concrete block construction with Passive Purple spray on airtightness to inside, 250mm WBS EPS External wall insulation with Silicone Render
Roof – 400mm I-joists with exposed glulam ridge beams with reconstituted slate finish and Lindab gutters and downspouts
Insulation – Warmcel recycled cellulose to roof with Compacfoam for thermal breaks
Air tightness:  Proclima air tightness tapes and membranes and Smartply Pro Passive 
Intermediate floor – 300mm I-joists
Windows & doors – Triple Glazed Passivhaus from Green Building Store
Rooflights  – Fakro
Soakaway for rainwater
Custom oak pergolas & beams
M&E:
MVHR – Paul Novus from Green Building Store
Solar – 4.48kW in-roof Solar PV array with immersion switch
Heating –  Worcester Bosch  gas boiler
EPC Rating: A
Air tightness: Average Air Changes per Hour 0.5/h @ 50Pa